Bedding inputs
Sand bedding requirement
How bedding sand quantity is calculated
The calculation treats the bedding layer as a uniform slab over the entered area.
Planning volume = base volume × (1 + allowance)
Tonnes = planning volume × bulk density
Worked example
For 200 m² at 40 mm thickness, the geometric bedding volume is 8 m³. With a 7% allowance, the planning volume becomes 8.56 m³. At 1.6 t/m³, that is about 13.70 tonnes.
Why thickness should not be guessed
Bedding requirements vary with the installation system. The calculator converts a specified thickness into material quantity; it does not decide the correct construction detail.
Paver bedding versus pipe bedding
Paver bedding is usually modeled as a broad uniform layer. Pipe bedding can have side zones and haunching that depend on trench and pipe geometry. For that application, use a trench-specific calculation instead of assuming a full-area layer.
Limitations
This estimate does not determine paving-system design, bedding quality, drainage performance or pipe-support requirements.
Frequently Asked Questions
Can I calculate tonnes?
Yes.
Does moisture change density?
Bulk density can change with moisture and packing.
Can this be used for pipe trenches?
Only for simple area-based bedding; detailed trench geometry should use a trench bedding calculation.
Should I add allowance?
A documented project allowance is useful.