Metal Order Quantity Calculator

Calculate the raw metal stock required to produce a required number of finished pieces, including material waste, production yield and optional safety stock.

Finished order

Production allowance

90% yield means 10% of the raw material is expected to be lost as scrap, machining waste, trimming, defects or other production loss.

Raw stock ordering

Order quantity results

Finished pieces required
—
Base material requirement
—
Material after yield
—
Safety allowance
—
Recommended raw stock
Expected production waste
—
Expected finished yield
—
Extra stock vs base
—

Production calculation

Formula

Base material = finished pieces × material per finished piece Material required after yield = base material ÷ (yield ÷ 100) Safety stock = yield-adjusted material × safety allowance ÷ 100 Recommended raw stock = yield-adjusted material + safety stock Expected waste = recommended raw stock − base material
A yield percentage is mathematically different from simply adding the same percentage as waste. For example, 90% yield means dividing the required finished material by 0.90.

Example

Order
100 finished pieces requiring 2.5 kg of material each.
Base requirement
100 × 2.5 kg = 250 kg.
90% production yield
250 ÷ 0.90 = 277.78 kg required before safety stock.
5% safety allowance
277.78 × 5% = 13.89 kg additional stock.
Recommended order
Approximately 291.67 kg of raw material.

Why raw material requirements increase

Actual production yield depends on the manufacturing process, part geometry, nesting efficiency, cutting method, machining allowance and defect rate. Use historical production data when available.

Frequently Asked Questions

How much raw metal do I need for an order? Enter the finished quantity, material required per piece and expected production yield. The calculator estimates the raw stock requirement.

What is production yield? Production yield is the percentage of raw input that becomes usable finished product.

Why does 90% yield require dividing by 0.90? Because only 90% of the input becomes usable output. Dividing the required output by 0.90 determines the required input.

Can I add safety stock? Yes. Enter an additional percentage to account for uncertainty or extra production requirements.

Can I calculate raw stock pieces? Yes. Enter the usable material available from one standard stock piece and the calculator rounds the required order quantity upward.

Does the calculator calculate waste? Yes. It shows the estimated difference between recommended raw stock and the theoretical material required in the finished pieces.

Can this be used for metal sheets, bars and plates? Yes. The core calculation applies to any raw metal stock when the material requirement per finished piece is known.