Estimate how much starting gold metal is required to deliver a target finished jewellery weight after accounting for sprue, process loss and overall recovery.
The model works backward from finished weight. First it adds the estimated sprue or runner requirement, then it increases the starting requirement to account for the specified process loss.
Casting System = Finished Weight ร (1 + Sprue %)
Starting Requirement = Casting System รท (1 โ Process Loss %)
Why a Finished Piece Is Not the Same as the Starting Charge
Production systems may require additional metal for gates, runners and other handling losses. Some of that material may later be recovered, so accounting should distinguish initial charge from permanent material loss.
Use Historical Production Data
For planning, replace generic allowances with your own historical rates for the jewellery design, alloy and process. That makes the estimate more useful for actual production control.
This is a mass-planning model and does not prescribe a casting or manufacturing process.
Frequently Asked Questions
What does starting metal requirement mean?
It is the estimated material needed before the modeled sprue and process losses occur.
Can recovered sprue be reused?
Potentially, depending on the production process and material controls.