Compare estimated workload with available hours at key jewellery-production stages. The tool highlights stages whose stated workload exceeds or nearly consumes their capacity.
A stage above 100% load cannot complete all the stated workload inside the stated capacity without more time, overtime, work transfer, reduced workload or another operational change.
High utilisation does not automatically prove causation. A polishing stage may be busy because casting or setting released a large batch. Conversely, a stage may be the true constraint even when its queue looks small if it has highly specialized work.